Abstract
Green deployment of Lean Six Sigma (LSS) projects is essential but unknown among
scholars and practitioners. Therefore, we aim at identifying top readiness factors of green
deployment of LSS projects. A survey questionnaire was distributed to LSS experts and
academics around the world. A Principal Component Analysis (PCA) was conducted to
identify top readiness factors. The analysis revealed seven new dimensions for critical
success factors (CSFs), critical failure factors (CFFs) and barriers, and five new
dimensions for motivators. This study serves as an initial call for managers and research
scholars to favour the sustainable deployment of LSS projects in manufacturing.
scholars and practitioners. Therefore, we aim at identifying top readiness factors of green
deployment of LSS projects. A survey questionnaire was distributed to LSS experts and
academics around the world. A Principal Component Analysis (PCA) was conducted to
identify top readiness factors. The analysis revealed seven new dimensions for critical
success factors (CSFs), critical failure factors (CFFs) and barriers, and five new
dimensions for motivators. This study serves as an initial call for managers and research
scholars to favour the sustainable deployment of LSS projects in manufacturing.
Original language | English |
---|---|
Pages | 1-10 |
Number of pages | 10 |
Publication status | Accepted/In press - 16 Feb 2021 |
Event | 28th EurOMA Conference: Managing the “new normal”: The future of Operations and Supply Chain Management in unprecedented times - Online: University of Sussex, Brighton, United Kingdom Duration: 5 Jul 2021 → 7 Jul 2021 https://www.euroma21.org/ |
Conference
Conference | 28th EurOMA Conference |
---|---|
Abbreviated title | EurOMA 2021 |
Country/Territory | United Kingdom |
City | Brighton |
Period | 5/07/21 → 7/07/21 |
Internet address |