A Risk Management Approach for Prediction of Contingency Sum for Public-Sector Construction Projects

Terence Lam*, Njavwa Siwingw

*Corresponding author for this work

Research output: Chapter in Book/Report/Conference proceedingChapterpeer-review

Abstract

A review of the literature supports the inclusion of sufficient contingency to cover risks in construction projects. From the client’s point of view, too much contingency may result in a project being aborted or uneconomical and too little may lead to cost escalation if the risk occurs. Risk factors at the construction phase causing cost overruns will be identified and an accurate method for estimation of contingency sum will be determined. Qualitative interviews were conducted with five expert practitioners working in a public works department in Zambia to determine how the contingency sum is estimated and what risk factors are considered. Multiple regression analysis was conducted using cost and risks data collected from 30 building and refurbishment projects recently completed in the department. The qualitative study found that project budget overruns constitute a major issue. The regression analysis results proved that the contingency sum was positively correlated to the estimated contract sum. The qualitative interview results and Pearson correlation coefficient showed there was also a positive correlation between contingency sum and project complexity, although such factor needs to be further reaffirmed by regression analysis using a larger sample size. To enhance project success in terms of cost, it is necessary that project managers should actively implement risk management in projects when calculating the contingency sum. Related project-specific risks should be identified and multiple regression method can be used to predict the contingency fund accordingly.
Original languageEnglish
Title of host publicationProceedings of the 20th International Symposium on Advancement of Construction Management and Real Estate
EditorsYuzhe Wu, Sheng Zheng, Jiaojiao Luo, Wei Wang, Zhibin Mo, Liping Shan
Place of PublicationSingapore
PublisherSpringer
Pages367–378
Number of pages12
Edition1st
ISBN (Electronic)9789811008559
ISBN (Print)9789811008542
DOIs
Publication statusPublished - 28 May 2016
Externally publishedYes

Keywords

  • Construction projects
  • Contingency sum
  • Construction phase
  • Risk management
  • Public-sector

Research Group keywords

  • Adaptation, Value, and the Built Environment

Cite this