BIM and AI Integration for Dynamic Schedule Management: A Practical Framework and Case Study

Heap-Yih Chong, Xinyi Yang, Cheng Siew Goh, Yan Luo*

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

4 Citations (Scopus)
45 Downloads (Pure)

Abstract

Traditional project scheduling tools like Gantt charts struggle with dynamic adjustments and real-time optimization in complex construction projects, leading to inefficiencies and delays. This study addresses this challenge by proposing a dynamic optimization framework that integrates Building Information Modeling (BIM) and Artificial Intelligence (AI) to enhance schedule management. The framework comprises three layers: a data layer for collecting BIM and real-time site data, an analysis layer powered by AI algorithms for predictive analytics and optimization, and an application layer for visualizing progress and supporting decision-making. Through a case study on a large-scale water reservoir tunnel project in China, the framework demonstrated significant improvements in identifying schedule risks, optimizing resource allocation, and enabling real-time adjustments. Key innovations include a 4-in-1 Network Diagram Engine and a Blueprint Engine, which facilitate intuitive progress monitoring and automated task management. However, limitations in personnel skill matching, interface complexity, and mobile system performance were identified. This research advances the theoretical foundation of BIM-AI integration and provides practical insights for improving scheduling efficiency and project outcomes in the construction industry. Future work should focus on enhancing human resource management modules and refining system usability for broader adoption.
Original languageEnglish
Article number2451
Number of pages29
JournalBuildings
Volume15
Issue number14
DOIs
Publication statusPublished - 12 Jul 2025

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 9 - Industry, Innovation, and Infrastructure
    SDG 9 Industry, Innovation, and Infrastructure

Keywords

  • building information modelling (BIM)
  • artificial intelligence (AI)
  • dynamic schedule management
  • construction project management

Fingerprint

Dive into the research topics of 'BIM and AI Integration for Dynamic Schedule Management: A Practical Framework and Case Study'. Together they form a unique fingerprint.

Cite this