Skip to main navigation Skip to search Skip to main content

Enhancing Forensic Analysis of Construction Project Delays Through Digital Interventions

  • Serife Ece Boyacioglu
  • , David Greenwood
  • , Kay Rogage
  • , Andrew Parry

Research output: Contribution to journal › Article › peer-review

3 Citations (Scopus)
50 Downloads (Pure)

Abstract

Project delays remain a persistent challenge in the construction industry, having significant financial implications and contributing to disputes between project participants. Forensic Delay Analysis (FDA) has emerged as a specialised function that identifies the root causes of such delays, quantifies their duration, and assigns responsibility to the appropriate parties. While FDA is a widely practised process, it has yet to fully exploit the potential of emerging technologies. This study explores the integration of both existing and emerging technologies for enhancing FDA processes. A Design Science Research (DSR) approach is adopted, with data collection methods that involve the use of the literature, archival materials, case studies and survey methods. The research demonstrates how the use of technologies, such as database management systems (DBMSs), building information modelling (BIM), artificial intelligence (AI) and games engines, can improve the analytical efficiency, data management, and presentation of findings through a case study. The study showcases the transformative potential of these interventions in streamlining FDA processes, ultimately leading to more accurate and efficient resolution of construction disputes. The proposed process is exemplified by the development of a prototype: the Forensic Information Modelling Visualiser (FIMViz). The FIMViz is a practical tool that has received positive evaluation by FDA experts. The prototype and the enhanced FDA process model that underpins it demonstrate significant advancement in FDA practices, promoting improved decision-making and collaboration between project participants. Further development is needed, but the results could ultimately streamline the FDA process and minimise the uncertainties in FDA outcomes, thus reducing the incidence of costly disputes to the wider economic benefit of the industry generally.
Original languageEnglish
Article number2391
Number of pages24
JournalBuildings
Volume15
Issue number14
DOIs
Publication statusPublished - 8 Jul 2025

Keywords

  • construction project delays
  • digital technologies
  • forensic delay analysis

Fingerprint

Dive into the research topics of 'Enhancing Forensic Analysis of Construction Project Delays Through Digital Interventions'. Together they form a unique fingerprint.

Cite this