Exploring the BIM and lean synergies in the Istanbul Grand Airport construction project

Ozan Koseoglu, Mehmet Sakin*, Yusuf Arayici

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

49 Citations (Scopus)

Abstract

Purpose: The purpose of this paper is to develop a solid understanding of how integrated building information modeling (BIM) is implemented in a mega project such as the (Istanbul Grand Airport IGA) construction project, which is the main case study in the research methodology. Design/methodology/approach: The paper examines and identifies the lean efficiency gains achieved in the IGA project and highlights the synergies between BIM and lean concepts based on the facts and figures from the case study analysis. In complex projects, there is a vital need for a comprehensive approach that would enable successful managing of design and construction information via accurate modeling, collaboration and integration throughout the project lifecycles covering various disciplines. Findings: The research findings in the paper make a significant impact in understanding the strategic perception for BIM as a new way of working methodology for the construction industry in Turkey, since the IGA project has become not only a key learning hub for the Turkish construction industry, but also a global landmark for digital construction and project delivery. In addition it proves the mutual synergies between BIM and lean practices. Originality/value: The IGA project is a mega-scale airport construction project with features beyond building industry challenges, and it should be designed and constructed with tight deadlines and budgets and be operated afterwards in an effective and efficient way. Can lean and BIM help for timely and on-budget completion of the project and could they support the management of the airport facility after handover? The paper also discusses the lean and BIM implementation in the project in relation to the BIM Level 3 requirements.

Original languageEnglish
Pages (from-to)1339-1354
Number of pages16
JournalEngineering, Construction and Architectural Management
Volume25
Issue number10
DOIs
Publication statusPublished - 19 Nov 2018
Externally publishedYes

Keywords

  • Building information modelling
  • Case study
  • Engineering
  • Project management
  • Scheduling
  • Strategic management

Fingerprint

Dive into the research topics of 'Exploring the BIM and lean synergies in the Istanbul Grand Airport construction project'. Together they form a unique fingerprint.

Cite this