TY - JOUR
T1 - Flammability assessment of phase change material wall lining and insulation materials with different weight fractions
AU - McLaggan, Martyn S.
AU - Hadden, Rory M.
AU - Gillie, Martin
PY - 2017/10/15
Y1 - 2017/10/15
N2 - The built environment increasingly includes innovative material aimed at drastically reducing energy consumption. Various types of phase change material (PCM) products are available but under the current fire safety guidelines their usage may be restricted due to their flammability, as is the case for some insulation materials. This study assesses the quantified fire performance of two different PCM plasterboards, a PCM-polymer sheathed in aluminium, and a polymeric macroencapsulated PCM insulation material. Insulation materials are shown to release much greater amounts of energy and are highly ignitable, and thus often require a suitable fire barrier. The thickness and thermal properties of this can be specified for the specific application to prevent ignition of the PCM. Lining materials have similar normalised burning rates for different PCM loadings and thus the optimal energy savings can be defined. Designers can select the maximum quantity of PCM loading for an acceptable fire risk, thus allowing the greatest potential for saving energy. The use of this knowledge allows designers to select the most suitable PCM for their need, and can enable the usage of materials where they are currently restricted.
AB - The built environment increasingly includes innovative material aimed at drastically reducing energy consumption. Various types of phase change material (PCM) products are available but under the current fire safety guidelines their usage may be restricted due to their flammability, as is the case for some insulation materials. This study assesses the quantified fire performance of two different PCM plasterboards, a PCM-polymer sheathed in aluminium, and a polymeric macroencapsulated PCM insulation material. Insulation materials are shown to release much greater amounts of energy and are highly ignitable, and thus often require a suitable fire barrier. The thickness and thermal properties of this can be specified for the specific application to prevent ignition of the PCM. Lining materials have similar normalised burning rates for different PCM loadings and thus the optimal energy savings can be defined. Designers can select the maximum quantity of PCM loading for an acceptable fire risk, thus allowing the greatest potential for saving energy. The use of this knowledge allows designers to select the most suitable PCM for their need, and can enable the usage of materials where they are currently restricted.
KW - Energy savings
KW - Fire performance
KW - Optimisation
KW - Performance-based design
KW - Phase change materials
UR - http://www.scopus.com/inward/record.url?scp=85028428813&partnerID=8YFLogxK
U2 - 10.1016/j.enbuild.2017.08.012
DO - 10.1016/j.enbuild.2017.08.012
M3 - Article
AN - SCOPUS:85028428813
VL - 153
SP - 439
EP - 447
JO - Energy and Buildings
JF - Energy and Buildings
SN - 0378-7788
ER -