Queue performance measures in construction simulation models containing subjective uncertainty

N. Sadeghi, A. Robinson Fayek*, N. Gerami Seresht

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

24 Citations (Scopus)

Abstract

In recent decades, discrete event simulation (DES) has been widely used for analyzing construction projects. Recently, fuzzy discrete event simulation (FDES), which is an integration of fuzzy set theory with DES, has been proposed for simulating construction projects. FDES provides a framework to consider subjective uncertainty (uncertainty due to vagueness, subjectivity, and linguistic expression of knowledge) in construction simulation models. Current FDES frameworks only calculate simulation time (e.g., project completion time) as the simulation output. However, queue performance measures (e.g., average queue length and waiting time) - though important simulation model outputs for decision making, finding bottlenecks, and optimizing construction resources - are not analyzed in current FDES methodologies. Using fuzzy logic to consider the subjective uncertainty of service time and the inter-arrival time of systems' queues may improve such simulation models by more realistically representing their results. This paper provides a novel methodology to consider subjective uncertainty in analyzing the fuzzy queues in construction FDES models. Incorporating fuzzy queuing theory with FDES methodology as proposed in this paper enhances the applicability of FDES in construction projects. The proposed methodology is validated through mathematically solved queueing examples, and its practical aspects are illustrated using an example of an asphalt paving operation.

Original languageEnglish
Pages (from-to)1-11
Number of pages11
JournalAutomation in Construction
Volume60
DOIs
Publication statusPublished - 1 Dec 2015
Externally publishedYes

Keywords

  • Construction management
  • Discrete event simulation
  • Fuzzy
  • Queueing

Fingerprint

Dive into the research topics of 'Queue performance measures in construction simulation models containing subjective uncertainty'. Together they form a unique fingerprint.

Cite this