TY - JOUR
T1 - Stochastic network-constrained co-optimization of energy and reserve products in renewable energy integrated power and gas networks with energy storage systems
AU - Mirzaei, Mohammad Amin
AU - Yazdankhah, Ahmad Sadeghi
AU - Mohammadi-ivatloo, Behnam
AU - Marzband, Mousa
AU - Shafie-khah, Miadreza
AU - Catalão, João P. S.
PY - 2019/6/20
Y1 - 2019/6/20
N2 - Increasing penetration of variable nature wind energy sources (WES) due to environmental issues, impose several technical challenges to power system operation as it is difficult to predict its output power because of wind intermittency. Power generation based on gas turbine with fast starting fitness and high ramping could better deal with inherent uncertainties comparing to other power generation sources. Considering natural gas network constraints impacts flexibility and participation of gas-fueled generation units on reserve and energy markets. Hence, the use of flexible energy storage system can reduce renewable sources alternation and the gas network limitation effects on power system operation cost. This paper proposes a two-stage stochastic network-constrained unit commitment based market clearing model for energy and reserve products in coordinated power and gas networks with the integration of compressed air energy storage (CAES) and WES. A six-bus electric system with a six-node gas system and IEEE reliability test system (RTS) 24-bus electric system with a ten-node gas network are considered to perform numerical tests and demonstrate the performance of the proposed model. The effect of including the constraints of the gas system on the power system operation cost in day-ahead co-optimization of energy and reserve products is evaluated using numerical studies. Also, including CAES reduces the power system operation cost, load shedding and wind spillage.
AB - Increasing penetration of variable nature wind energy sources (WES) due to environmental issues, impose several technical challenges to power system operation as it is difficult to predict its output power because of wind intermittency. Power generation based on gas turbine with fast starting fitness and high ramping could better deal with inherent uncertainties comparing to other power generation sources. Considering natural gas network constraints impacts flexibility and participation of gas-fueled generation units on reserve and energy markets. Hence, the use of flexible energy storage system can reduce renewable sources alternation and the gas network limitation effects on power system operation cost. This paper proposes a two-stage stochastic network-constrained unit commitment based market clearing model for energy and reserve products in coordinated power and gas networks with the integration of compressed air energy storage (CAES) and WES. A six-bus electric system with a six-node gas system and IEEE reliability test system (RTS) 24-bus electric system with a ten-node gas network are considered to perform numerical tests and demonstrate the performance of the proposed model. The effect of including the constraints of the gas system on the power system operation cost in day-ahead co-optimization of energy and reserve products is evaluated using numerical studies. Also, including CAES reduces the power system operation cost, load shedding and wind spillage.
KW - Day-ahead market clearing
KW - natural gas transmission system
KW - compressed air energy storageprogramming
KW - wind energy sources
KW - two stage stochastic programming
U2 - 10.1016/j.jclepro.2019.03.021
DO - 10.1016/j.jclepro.2019.03.021
M3 - Article
SN - 0959-6526
VL - 223
SP - 747
EP - 758
JO - Journal of Cleaner Production
JF - Journal of Cleaner Production
ER -