Abstract
Cost overrun is a global issue plaguing transportation infrastructure projects, and the rail industry in the United Kingdom is not exempted. This industry plays a significant role in stimulating the country’s economic development and growth in the United Kingdom (UK). Understanding the factors contributing to cost overruns in rail projects is viable to sustain its contribution, especially in the COVID-19 epidemic era. This study analyzed and predicted the impact of cost overruns on rail projects in the UK in a COVID-19 pandemic era through a sparse network and system dynamics approach. It leverages a review of existing literature and perceptions of 80 construction professionals purposively to establish the factors affecting cost overruns affecting the UK rail construction sector. Findings reveal a web of causations that highlights labor productivity, delay in the supply of construction materials and equipment, and access to the site as fundamental predictors of cost overruns during a COVID-19 pandemic era. The resulting findings are beneficial to assist project managers with the needed awareness to strategically plan and mitigate the potential rise in cost overruns of rail projects in the UK during the pandemic.
| Original language | English |
|---|---|
| Article number | 215824402210979 |
| Number of pages | 20 |
| Journal | SAGE Open |
| Volume | 12 |
| Issue number | 2 |
| Early online date | 20 May 2022 |
| DOIs | |
| Publication status | Published - 2022 |
| Externally published | Yes |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 3 Good Health and Well-being
-
SDG 8 Decent Work and Economic Growth
-
SDG 9 Industry, Innovation, and Infrastructure
Keywords
- Cost overrun
- COVID-19
- Network
- Rail projects
- System dynamics
- United Kingdom
- rail projects
- system dynamics
- cost overrun
- network
Fingerprint
Dive into the research topics of 'The System Dynamics Analysis of Cost Overrun Causations in UK Rail Projects in a COVID-19 Epidemic Era'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver